英文字典中文字典


英文字典中文字典51ZiDian.com



中文字典辞典   英文字典 a   b   c   d   e   f   g   h   i   j   k   l   m   n   o   p   q   r   s   t   u   v   w   x   y   z       







请输入英文单字,中文词皆可:


请选择你想看的字典辞典:
单词字典翻译
tigue查看 tigue 在百度字典中的解释百度英翻中〔查看〕
tigue查看 tigue 在Google字典中的解释Google英翻中〔查看〕
tigue查看 tigue 在Yahoo字典中的解释Yahoo英翻中〔查看〕





安装中文字典英文字典查询工具!


中文字典英文字典工具:
选择颜色:
输入中英文单字

































































英文字典中文字典相关资料:


  • Plutonium Uranium Extraction Plant (PUREX) - Hanford Site
    The Plutonium Uranium Extraction Plant operated from 1956 to 1972 and 1983 to 1988, to chemically reprocess fuel rods irradiated in Hanford’s reactors The photo is from April 2022 The Plutonium Uranium Extraction Plant (PUREX) was the fifth and final chemical processing facility built at Hanford
  • Crews Demolish Support Area Near Former Hanford Processing Facility . . .
    Crews at the Hanford Site are reducing risk at the Plutonium Uranium Extraction Plant (PUREX), one of the site’s five former chemical separations facilities
  • PUREX - Wikipedia
    The PUREX plant at the Hanford Site was responsible for producing 'copious volumes of liquid wastes', resulting in the radioactive contamination of groundwater
  • Hanfords former PUREX plant is prepared for disposition
    Work crews at the Department of Energy’s Hanford Site in Washington state are performing risk-reduction activities at the Plutonium Uranium Extraction (PUREX) plant to prepare it for eventual disposition
  • Understanding the PUREX Process with the Hanford Facility
    North Korea, a threat to the international nuclear non-proliferation regime, has a reprocessing facility using the PUREX process The differences between the Hanford facility, the reference facility for this study, and the reprocessing facility in North Korea are as follows
  • A Brief History of the PUREX and UO3 Facilities
    When the REDOX Plant closed in 1967, PUREX became the sole, operating processing facility at the Hanford Site In 1972, the PUREX Plant entered a temporary shutdown period that lasted 11 years
  • IMINT DOE - Hanford Site
    The PUREX solvent extraction (tributyl phosphate) system was operated from January 12, 1956 until the end of September 1972, to separate and decontaminate uranium, plutonium, and neptunium produced by the Hanford reactors PUREX closed in 1990 and deactivation activities are in progress
  • PUREX | Hanford Dangerous Waste Permit - Washington
    South of PUREX are two storage tunnels that hold discarded equipment from PUREX and items that must be handled remotely due to high levels of radiation The first tunnel was built in 1956 and sealed in 1965, and holds eight railcars of waste
  • PUREX UO {sub 3} facilities deactivation lessons learned history
    The Plutonium-Uranium Extraction (PUREX) Facility operated from 1956-1972, from 1983-1988, and briefly during 1989-1990 to produce for national defense at the Hanford Site in Washington State
  • PUREX UO3 facilities deactivation lessons learned history
    The Plutonium-Uranium Extraction (PUREX) Facility operated from 1956-1972, from 1983-1988, and briefly during 1989-1990 to produce for national defense at the Hanford Site in Washington State





中文字典-英文字典  2005-2009